Home
Services & Technology
Engineered Solutions  
Completion Systems

Engineered Solutions

Trican can custom design the optimal completion package for your wellbore, whether open hole or cemented.

Cemented Ball Drop Completions
Typical applications for Multi-Stage Fracturing (MSF) with Cemented Completion Systems using ball-activated sliding sleeves:

  • Cemented Limited Entry MSF Completions

    • Available in 114mm (4 ½ in.) in 10k psi rating, or 140mm (5 ½ in.) in a 15k psi rating
    • Up to 400 stages with limited entry fracs
    • i-Frac valve systems can be run as liners or monobore installations

  • Cemented Extended Reach MSF Completions

    • i-Frac limited entry valves are used beyond the reach of coiled tubing
    • Coil-shifted sleeves can be opened/closed for additional wellbore control
    • Coiled Tubing shiftable sleeves are used closer to the vertical section of the well

  • Open Hole Monobore – Cemented Upper

    • 114mm (4.5 in.) and 140mm (5.5 in.) systems
    • Open Hole or Swellable Packers for isolation
    • i-Valve CT Shifted Valve for Stage Cementing
      • Upper string cemented on CT or drill pipe
      • Positive indication of displacement using darts
      • Upper completion wiped clean with the cementing tool
      • No debris left in the well

Open Hole Ball Drop Completions
Typical applications for Multi-Stage Fracturing (MSF) with Open Hole Completion Systems using ball-activated sliding sleeves:

  • Open Hole Single Stage MSF Completions

    • Available in 114mm (4 ½ in.) or 140mm (5 ½ in.) in 10k psi rating
    • 1/16 in. increments available to maximize the number ofstages. Over 40 stages can be completed.


  • Open Hole Limited Entry MSF Completions

    • Available in 114mm (4 ½ in.) or 140mm (5 ½ in.) in 10k psi rating
    • Up to 400 stages using the Trican i-Frac limited entry sleeve
    • May be installed as a monobore or liner system

Coiled Tubing Cemented and Open Hole MSF Completions

  • BPS (Burst Port System)®
    • Cemented BPS® MSF Completions

      • Available in 114mm (4 ½ in.) and a variety of other common liner sizes
      • The number of stages is limited by wellbore geometry and the reach of coiled tubing
      • Selective fracturing on coiled tubing

    • Open Hole BPS® MSF Completions

      • Available in 114mm (4 ½ in.) and a variety of other common liner sizes
      • Unlimited number of stages depending on wellbore geometry and the reach of coiled tubing
      • Coiled tubing fracs
      • May be run as a monobore or liner

  • i-Valve
    • Cemented Extended Reach MSF Completions

      • i-Frac limited entry valves are used beyond the reach of coiled tubing
      • Coil-shifted sleeves can be opened/closed for additional wellbore control
      • CT shiftable sleeves are used closer to the vertical section of the well

    • Cemented Full Bore MSF Completions

      • Valves can be selectively opened and fractured with coiled tubing
      • The number of stages is limited by wellbore geometry and the reach of coiled tubing
      • Coil-shifted sleeves can be opened/closed for additional wellbore control
 
Terms of Use  |  Privacy  |  ©Copyright 2014  TRICANTM. All Rights Reserved.